Skip to main content

NAVAL NEWS - 54 YEARS AGO - C553 ITS ANDREA DORIA Comissioned - 23.02.1964


On Sunday 23rd February 1964 the Italian Navy commissioned the Andrea Doria Class Helicopter Cruiser C553 ITS ANDREA DORIA CARLA. She was built by CNR, Riva Trigoso as Hull Number 248.

Ordered in the 1957-58 Naval Programme, the Andrea Doria class were designed to operate the RIM-2 Terrier surface to air missile (SAM) system and Sikorsky SH-3 Sea King helicopters as both a platform for anti-air and anti-submarine warfare. The hull was based on the IMPAVIDO Class, with a length of 149.3 metres and an enlarged beam to allow for the installation of a flight deck and hangar, measuring 17.3 metres. She had a draught of 5.0 m and displaced 5,000 tons standard and 6,500 tons loaded.

The cruisers were also equipped with six 324-millimetre (13 in) Mk32 torpedo tubes in two triple mounts. These were for use against submarines.In conjunction with the torpedo systems, the Andrea Dorias could embark up to four helicopters. The Sea Kings were found to be too large for the class and the Italians instead chose to use Agusta-Bell AB212 helicopters modified for anti-submarine warfare.



Below image is of the cruiser moored at Valletta (Grand Harbour), Malta back to 1969 -


Photos by Capt. Lawrence Dalli. Do not use these images without my permission. © All rights reserved. Malta Ship Photos & Action Photos - www.maltashipphotos.com


Comments

Popular posts from this blog

DRYDOCKING - Ferry RIGEL II at Malta - 06.03.2018. The 1980 built CYP flag ferry RIGEL II  left Valletta (Grand Harbour), Malta from Palumbo Malta Shipyard Dock 4 on Monday 12th March 2018 assisted by 1 local SEA SALVOR with 1 pilot aboard while 1 Pilot was assisting the dock master at the Dock. She was built in Sweden by Oresundsvarvet Landskona as Yard Number 278 launched as VISBY for Rederi AB Gotland. During  1990 the   VISBY was chartered to UK   based ferry operator Sealink British Ferries.   Following a major refit atTilbury, the ferry entered service in March 1990 as the FELICITY.  The FELICITY was renamed STENA FELICITY   in 1991 following the acquisition of Sealink British Ferries by Stena Line.  In 1997 the charter of the STENA FELICITY  ended of which her place on the Fishguard route was taken by another ferry the KONINGIN BEATRIX. Following a refit and rebuild in Germany, the vessel re-entered Gotl...
VALLETTA CRUISE PORT -  Week 28 of 2018 . Interesting Week seeing different types of ships with cruise liners Aerial Image of GRAND HARBOUR, Malta back to 8th December 2009 Sunday 8th July, 2018. At 2210 hrs the 2007 built MLT flag passenger ship  ARTEMIS  left Valletta from  Pinto 4 wharf. Wednesday 11th July, 2018. From 0614 to 1733 hrs the 2018 built  MSC SEAVIEW  was at Valletta berthed at Pinto 1 and 2 wharves.   From 0628 to 1703 hrs the  the 1998 built  VISION OF THE SEAS was at Valletta berthed at Pinto 4 and 5 wharves . Vessel  was represented in Malta by SMS Shipping (http://www.sms.com.mt) Thursday 12th July, 2018. From 0514 to 2147 hrs the 2000 built BMU flag cruise liner OCEANA  was at  Valletta berthed at  Pinto 1 and 2 wharves. Vessel was represented in Malta by Malta Cruise Services, a division of Mifsud  Brothers Ltd - ( http://www.mbl.com.mt/) ...
Fugro to install new undersea power cable in South Australia Fugro has been awarded a contract to install a subsea power cable for South Australia’s distribution network management company, SA Power Networks. The new 20,000 kVA/33,000 Volt cable will replace the existing 10,000 kVA/33,000 Volt undersea cable, which is reaching the end of its life. The subsea asset is a continuous 15-kilometre-long cable, weighing 600 tonnes and connects Kangaroo Island to the distribution network on the southern Fleurieu Peninsula, south of Adelaide. Fugro will design and supply the power cable and will use its multi role support vessel, REM ETIVE, to install it across Backstairs Passage, from Fishery Beach on the mainland to Cuttlefish Bay on Kangaroo Island. “As a multi-disciplinary project delivery and subsea services provider, we operate high specification vessels and remotely operated technology, enabling Fugro to deliver turnkey solutions like this one,” said Marcus Hemsted, Business D...