Skip to main content

Stranded GOLFO AZZURRO heads north towards Sicily after more than 24 hours in maritime limbo - 08.08.2017


A rescue vessel which spent more than 24 hours drifting just outside Malta's territorial waters has headed north towards Sicily and she's currently 14.7 nautical miles off Pozzallo Port. 
Meanwhile the Guardia Costiera CP 300 Class Patrol craft CP 325 left Pozzallo Port at 1555 hrs to meet GOLFO AZZURRO although it is not yet clear whether the ship's crew and passengers will be allowed into Italy.  

The vessel, which is carrying three migrants aboard, was stranded in international waters following a diplomatic tug-of-war between Italian and Maltese authorities.

The ship's captain originally planned to disembark in Lampedusa but diverted towards Malta after Italian authorities denied her entry into its ports, allegedly saying Barcelona-based NGO Proactiva Open Arms, which is running the rescue operation, had failed to comply with a recently-introduced code of conduct.

Maltese authorities also declined to green light the ship's entry, insisting that international maritime law clearly stated that the ship had to be granted entry to the nearest port of call - in this case Lampedusa.



Images of CP 325 and GOLFO AZZURRO - www.maltashipphotos.com

Proactiva Open Arms said on Twitter that a second boat it operates received a threatening radio call from the Libyan coastguard on Monday morning while patrolling international waters some 13 miles from the Libyan coast between Tripoli and Zuara.

A spokesperson for the NGO told Reuters that the Libyan coastguard had fired shots into the air in the direction of the boat. The NGO also published a video of the alleged incident on Twitter. 
https://twitter.com/openarms_fund/status/894835757675933697


Comments

Popular posts from this blog

DRYDOCKING - Ferry RIGEL II at Malta - 06.03.2018. The 1980 built CYP flag ferry RIGEL II  left Valletta (Grand Harbour), Malta from Palumbo Malta Shipyard Dock 4 on Monday 12th March 2018 assisted by 1 local SEA SALVOR with 1 pilot aboard while 1 Pilot was assisting the dock master at the Dock. She was built in Sweden by Oresundsvarvet Landskona as Yard Number 278 launched as VISBY for Rederi AB Gotland. During  1990 the   VISBY was chartered to UK   based ferry operator Sealink British Ferries.   Following a major refit atTilbury, the ferry entered service in March 1990 as the FELICITY.  The FELICITY was renamed STENA FELICITY   in 1991 following the acquisition of Sealink British Ferries by Stena Line.  In 1997 the charter of the STENA FELICITY  ended of which her place on the Fishguard route was taken by another ferry the KONINGIN BEATRIX. Following a refit and rebuild in Germany, the vessel re-entered Gotl...
VALLETTA CRUISE PORT -  Week 28 of 2018 . Interesting Week seeing different types of ships with cruise liners Aerial Image of GRAND HARBOUR, Malta back to 8th December 2009 Sunday 8th July, 2018. At 2210 hrs the 2007 built MLT flag passenger ship  ARTEMIS  left Valletta from  Pinto 4 wharf. Wednesday 11th July, 2018. From 0614 to 1733 hrs the 2018 built  MSC SEAVIEW  was at Valletta berthed at Pinto 1 and 2 wharves.   From 0628 to 1703 hrs the  the 1998 built  VISION OF THE SEAS was at Valletta berthed at Pinto 4 and 5 wharves . Vessel  was represented in Malta by SMS Shipping (http://www.sms.com.mt) Thursday 12th July, 2018. From 0514 to 2147 hrs the 2000 built BMU flag cruise liner OCEANA  was at  Valletta berthed at  Pinto 1 and 2 wharves. Vessel was represented in Malta by Malta Cruise Services, a division of Mifsud  Brothers Ltd - ( http://www.mbl.com.mt/) ...
Fugro to install new undersea power cable in South Australia Fugro has been awarded a contract to install a subsea power cable for South Australia’s distribution network management company, SA Power Networks. The new 20,000 kVA/33,000 Volt cable will replace the existing 10,000 kVA/33,000 Volt undersea cable, which is reaching the end of its life. The subsea asset is a continuous 15-kilometre-long cable, weighing 600 tonnes and connects Kangaroo Island to the distribution network on the southern Fleurieu Peninsula, south of Adelaide. Fugro will design and supply the power cable and will use its multi role support vessel, REM ETIVE, to install it across Backstairs Passage, from Fishery Beach on the mainland to Cuttlefish Bay on Kangaroo Island. “As a multi-disciplinary project delivery and subsea services provider, we operate high specification vessels and remotely operated technology, enabling Fugro to deliver turnkey solutions like this one,” said Marcus Hemsted, Business D...