Skip to main content

Transocean reactivates ultra-deepwater semi, secures work for idle rigs


Transocean has issued an update on its offshore drilling rig fleet and as of July 25, 2017, the company’s contract backlog is $10.2 billion.
Offshore Australia, Quadrant Energy has awarded the ultra-deepwater semi submersible GSF Development Driller I a three-well contract plus two one-well options. Following a cold-stacked reactivation and mobilization, the floater is expected to begin operations in 1Q 2018.
Off Myanmar, Woodside exercised two one-well options for the ultra-deepwater drillship Dhirubhai Deepwater KG2.
In the US Gulf of Mexico, Deep Gulf Energy has contracted the ultra-deepwater drillship Deepwater Asgard  for two wells. The drillship was previously idle.
The ultra-deepwater semisubmersible Development Driller III was awarded a two-well contract. The customer and location was not disclosed. The semi was previously idle.
In the UK North Sea, BP awarded the harsh environment semisub Paul B. Loyd, Jr. a one-well option.
In the Norwegian North Sea, Aker BP exercised three one-well options for the harsh environment semi Transocean Arctic. Drilling is expected to begin in September.
The midwater floaters Transocean Prospect and Transocean Searcher were classified as held for sale. Transocean said the rigs will be recycled in an environmentally responsible manner.

Image of Drillship DEEPWATER CHAMPION with IMO as 9471862 offshore Marsaxlokk Harbour, Malta back to 6th March ,2011 - www.maltashipphotos.com

Comments

Popular posts from this blog

VALLETTA CRUISE PORT -  Week 28 of 2018 . Interesting Week seeing different types of ships with cruise liners Aerial Image of GRAND HARBOUR, Malta back to 8th December 2009 Sunday 8th July, 2018. At 2210 hrs the 2007 built MLT flag passenger ship  ARTEMIS  left Valletta from  Pinto 4 wharf. Wednesday 11th July, 2018. From 0614 to 1733 hrs the 2018 built  MSC SEAVIEW  was at Valletta berthed at Pinto 1 and 2 wharves.   From 0628 to 1703 hrs the  the 1998 built  VISION OF THE SEAS was at Valletta berthed at Pinto 4 and 5 wharves . Vessel  was represented in Malta by SMS Shipping (http://www.sms.com.mt) Thursday 12th July, 2018. From 0514 to 2147 hrs the 2000 built BMU flag cruise liner OCEANA  was at  Valletta berthed at  Pinto 1 and 2 wharves. Vessel was represented in Malta by Malta Cruise Services, a division of Mifsud  Brothers Ltd - ( http://www.mbl.com.mt/) ...
DRYDOCKING - Ferry RIGEL II at Malta - 06.03.2018. The 1980 built CYP flag ferry RIGEL II  left Valletta (Grand Harbour), Malta from Palumbo Malta Shipyard Dock 4 on Monday 12th March 2018 assisted by 1 local SEA SALVOR with 1 pilot aboard while 1 Pilot was assisting the dock master at the Dock. She was built in Sweden by Oresundsvarvet Landskona as Yard Number 278 launched as VISBY for Rederi AB Gotland. During  1990 the   VISBY was chartered to UK   based ferry operator Sealink British Ferries.   Following a major refit atTilbury, the ferry entered service in March 1990 as the FELICITY.  The FELICITY was renamed STENA FELICITY   in 1991 following the acquisition of Sealink British Ferries by Stena Line.  In 1997 the charter of the STENA FELICITY  ended of which her place on the Fishguard route was taken by another ferry the KONINGIN BEATRIX. Following a refit and rebuild in Germany, the vessel re-entered Gotl...
Last Voyage - SEVEN OSPREY at Malta - 05.01 - 17.02.2018. The 1984 built LBR flag diving and light construction  vessel SEVEN OSPREY  left Valletta (Grand Harbour), Malta on Saturday 17th February, 2018 from Bormla Wharf at Palumbo Malta Shipyard Ltd after she entered Valletta on Friday 5th January berthing at the Mediterranean Maritime Hub (MMH) and shifted to Palumbo on Saturday 6th January. She was built as the SEACOM until January 1986, NORSKALD until January 1990, SEAWAY OSPREY until February 2006 and ACERY OSPREY until January 2013 and she was the oldest ship in versatile and modern fleet of Subsea 7.   Below images are of her entering Valletta, back on Friday 5th January, 2018 -  Below images are of her shifting at Valletta, back on Saturday 6th January, 2018 -  Below images are of her leaving Valletta on Saturday 17th February, 2018 -  Photos by Capt. Lawrence Dalli. Do not use these ima...